My shed was constructed from materials reclaimed during the demolition of a 1970s Secondary School in Perth. The doors are from the main corridors, the windows from the art room and the timber was stripped from various areas around the old school - even the steps were made from the tray runners in the dining hall!
I didn't draw any plans for the shed it just evolved to suit the materials available. It took about 40 hours to complete